Introduction
Steel construction relies on accurate drawings to communicate design intent to fabrication shops and site installation teams. Two important deliverables are steel shop drawings and erection drawings. Although both are produced as part of the steel detailing process, they serve different purposes.
What Are Steel Shop Drawings?
Steel shop drawings provide fabrication-level information for individual steel members and assemblies. They explain how components should be prepared and manufactured according to the approved structural design and project specifications.
Typical shop drawing information includes:
- Member dimensions, profiles, and material grades.
- Plate sizes, stiffeners, and connection components.
- Bolt-hole locations, weld symbols, and edge distances.
- Assembly details, piece marks, and identification labels.
- Relevant cutting, drilling, and fabrication information.
What Are Steel Erection Drawings?
Erection drawings guide the installation of structural steel at the construction site. They show where each member belongs within the overall structure and help site teams identify and position steel components.
Typical erection drawing information includes:
- Grid lines, elevations, and structural reference points.
- Beam, column, brace, and assembly locations.
- Piece marks linked to individual members.
- Floor plans, framing plans, and relevant sections.
- Installation-related notes and references to approved details.
Key Differences
Primary purpose: Shop drawings support fabrication, while erection drawings support on-site assembly.
Level of detail: Shop drawings focus on individual parts and assemblies. Erection drawings focus on the location and arrangement of those parts in the structure.
Primary users: Fabricators mainly use shop drawings; erectors and site supervisors mainly use erection drawings.
How the Two Drawing Types Work Together
Piece marks and coordinated model information connect fabrication drawings with erection plans. Accurate revision control and review procedures help ensure that the correct components reach the site and are installed in the intended locations.
Conclusion
Both shop drawings and erection drawings are essential deliverables in steel construction. When prepared accurately and coordinated with approved design documents, they help fabrication and installation teams work efficiently and reduce avoidable errors.